Here is the second set of gudgeon's going on. The picture shows a test dry fitting lined up with the laser before fixing with bolts and epoxy.
I am slowly getting to use all the extra parts I bought during construction of hull 1. Buying two sets of everything early on means not much money has been spent during the second hull build.
No comments:
Post a Comment